Stress Skin Wall Panels
 
The stress skin panels arrive and coverning the frame's exterior begins with the wall panels.
 

   


The driver had to back down to the road. He couldn't turn around. June 30
The panels come well wrapped from Davis Frame.
First panels are up! July 1
Masked Man at a run. July 1
Where the boom won't reach the hay hook will! July 1
Closing in... July 2
Around the corner. July 3
The next panel to go up. July 3
The lull lift. July 3
Panel joints foamed. July 7
The mini windows. July 7
Panel Dudes. July 7
Driving ring shanks. July 9
Window wall. July 9
Cutting panels with the beam saw. July 9
Routing a panel with the paddle router is a dusty job. July 9
Dusting off with air. July 9
A view from below. July 9
The window wall from the ski trail. July 9
Panels up on the south side. July 10
Closing in the timber frame. East side. July 15
A closer view of the east side. July 15
The building is taking shape. July 16
Paneling the east side of the tower. July 17
Modification: Wall removed eliminates deck but vastly improves view. July 21
A view of the west wall with the roof panels on. July 23
Last panels on the west are in. Aug 19
Last panels to the east are in. Aug. 19
A couple of steps for the highest window. Aug 25