| | The first sheets of Advantech are installed. June 12 |
| | |
| | Clear spring days are rare and very appreciated. June 17 |
| | | The point with temporary decking. June 17 |
| | | The first floor joists. June 24 |
|
| | View from the tree house. June 25 |
| | | Now here is an angle. June 25 |
| | | Long reach of the Lull. June 25 |
|
| | Floor joists galore. June 27 |
| | | Welding the steel beam to brackets. June 27 |
| | | A bit of traditional framing. July 3 |
|
| | The stick framed walls. July 7 |
| | | Walls framed for this level. July 8 |
| | | Rafters for the first level. July 16 |
|
| | A new gable end for the first level. July 16 |
| | | An asymmetrical set of rafters. July 17 |
| |
| | Interior walls form bed and bathrooms. Aug 15 |
| | |