Second Level Framing (Ground Floor)
 
With the timber frame complete, the framing continues and starts off with the floor joists for the next level with interior walls to follow.
 

   


The first sheets of Advantech are installed. June 12
A wet cut man. June 13
A wet floor. June 13
Clear spring days are rare and very appreciated. June 17
The point with temporary decking. June 17
The first floor joists. June 24
View from the tree house. June 25
Now here is an angle. June 25
Long reach of the Lull. June 25
Floor joists galore. June 27
Welding the steel beam to brackets. June 27
A bit of traditional framing. July 3
The stick framed walls. July 7
Walls framed for this level. July 8
Rafters for the first level. July 16
A new gable end for the first level. July 16
An asymmetrical set of rafters. July 17
The one valley. July 29
Interior walls form bed and bathrooms. Aug 15