Week 9
 
Week of Sept. 4th through Sept. 10th
 

   


lights in the trap zone
installed and wired
modified general lighting plan in GR (or a Pats offensive play)
can light in GR ceiling
Panel C wired
speaker wire
another speaker (there are 4)
insulation in ceiling
insulation on heating pipes (thanks Rick)
building permit
with approvals
sound insulation in back wall
make up wall
new insulation in outside wall near door to stage
the rail is cleaned and labeled
136_3667
136_3665
old pin rail shorter
other half now is on the SL wall
paint traap done!
first time opened
half open
the other half
fully opened