| | | | modified general lighting plan in GR (or a Pats offensive play) |
|
| | |
| | another speaker (there are 4) |
| | | | insulation on heating pipes (thanks Rick) |
|
| | | | sound insulation in back wall |
|
| | | new insulation in outside wall near door to stage |
| | | the rail is cleaned and labeled |
|
| | |
| | other half now is on the SL wall |
| | |
| | |