| | sample of the new bead board |
| | | old fire extinghuisher mark by the door to the GR |
| | | The new extension being layed out |
|
| | the extension in progress |
| | | Tom and Mark commenting that "there's a show to be be put on" |
| | | the extension in progress |
|
| | one of the 6 bays under the new extension |
| | | Bob Peters stops by for a visit |
| | | buider of the old extension chats with the builder of the new |
|
| | |
| | |
| | | Tom building the new half wall |
| | | Susan doing the primer in the "trap zone" |
|
| | the paint trap (which is still to be made) |
| | | Bill Maxwell sanding the HDO, Doug Cooper in the background |
| | | sanding the whole floor was a LOT of work: Thanks Bill! |
|
| | |
| | Rick installed insulation on the heating pipes |
| | | speaker volume and intercom boxes by the door to the stage |
| | | Rick helping with the fire resistant paint in the trap zone |
|
| | Susan painted all day Sunday |
| | |