Week 7
 
Week of August 21 through 27
 

   


sample of the new bead board
old fire extinghuisher mark by the door to the GR
The new extension being layed out
the extension in progress
Tom and Mark commenting that "there's a show to be be put on"
the extension in progress
one of the 6 bays under the new extension
Bob Peters stops by for a visit
buider of the old extension chats with the builder of the new
done!
135_3528
135_3529
135_3530
audience POV
I added a trim strip
heating circulators
Tom building the new half wall
Susan doing the primer in the "trap zone"
the paint trap (which is still to be made)
Bill Maxwell sanding the HDO, Doug Cooper in the background
sanding the whole floor was a LOT of work: Thanks Bill!
Doug starts the primer
primer is done!
TV feed installed
Rick installed insulation on the heating pipes
speaker volume and intercom boxes by the door to the stage
Rick helping with the fire resistant paint in the trap zone
Susan painted all day Sunday
almost done