| | loading in the HDO (floor covering) |
| | | | with an 8p ring lock nail |
|
| | | fitting the cut around the proscenium |
| | | Tommy saying "Oh no, you again" |
|
| | detail of sliding doors on costume room |
| | | wiring in dressing room #1 |
| |
| | cutting the new sprinkler pipe |
| | |
| | | | new head with fitting waiting for ceiling |
|
| | | | paint trap covered (temporarily) |
|
| | new floor at enterence to stage from GR |
| | | new fire rated door frame |
| |
| | | | SL looking from stairs from hall |
|
| | |
| | | | dug out for new concrete slab at the shop door |
|