Week 4
 
Week of July 31st - August 4
 

   


loading in the HDO (floor covering)
the first sheets go down
with an 8p ring lock nail
prepping the wings
fitting the cut around the proscenium
Tommy saying "Oh no, you again"
detail of sliding doors on costume room
wiring in dressing room #1
old sprinkler in office
cutting the new sprinkler pipe
132_3292
ceiling in costume room
new sprinkler connection
old sprinkler terminated
new head with fitting waiting for ceiling
trap zone stage left
looking towards the shop
paint trap covered (temporarily)
new floor at enterence to stage from GR
new fire rated door frame
133_3358
SL wing
SR wing
SL looking from stairs from hall
133_3363
133_3364
left over HDO (7 sheets)
the floor is done
133_3368
dug out for new concrete slab at the shop door