Week 2
 
July 17 - 21, 2006
 

   


lifting the beam
setting the 8X8 post
finally in place
cutting out in front of the stairs to the light loft
new office wall
new load bearing wall SL
130_3076
the steel arrives
hoisting into shop
dolly into shop
Carole tries out the weight of a column
cutting out the beam for the streel
welding the post
another beam comes in
cutting the post to exact height
131_3139
more welding
beam on column
column on plate
drilling the 2X12s to prepare for bolts
first steel in place
all steel in place
steel #3 has been "wrapped" with lumber
more concrete
Tommy inscribes concrete "Dave 06 FOPAC" (it will be covered later)
adding concrete to the old furnace room
more lumber
131_3180
putting the rear joists into place
131_3177
joists in in the trap zone before hangers are added