| | cutting out in front of the stairs to the light loft |
| | |
| | |
| | | Carole tries out the weight of a column |
| | | cutting out the beam for the streel |
|
| | | | cutting the post to exact height |
|
| | |
| | | drilling the 2X12s to prepare for bolts |
| |
| | | steel #3 has been "wrapped" with lumber |
| |
| | Tommy inscribes concrete "Dave 06 FOPAC" (it will be covered later) |
| | | adding concrete to the old furnace room |
| |
| | | putting the rear joists into place |
| |
| | joists in in the trap zone before hangers are added |
| | |