before demo started and Day 1
 
Pix from Saturday July 1st, the final clean out and Thursday, July 6, 2006, the first day of demo.
 

   


128_2801
128_2802
128_2817
128_2818
128_2819
128_2837
128_2825
demo on stage begins
128_2894
128_2896
128_2899
129_2902
129_2904
some of the old studs in the GR walls were a little short.
the kitchen
129_2910
129_2913
129_2914
waiting for Friday's dumpster
is a pile of flooring (we saved some)
The stage at about 2:00pm Thursday
129_2921
where the kitchen was
This structural beam on the side wall of the kitchen is totally rotted out.
The Green Room at about 2:00pm Thursday
129_2930
129_2931
the stage with just the sub flooring. Notice the traps.
sub floor detail