I have started the subroadbed for the hidden
return loop under the power plant.
Tonight I got out my 3rd PlanIt drawings and
taped together the hidden return loop to make one large
drawing.
After cutting and trimming the 3 main
sheets to get the tracks to line up correctly I had this large
drawing:
I draped it over the benchwork frame
for a test fit just to check if anything was grossly out of
alignment.
With that checked out OK, I cut out
templates for subroadbed pieces and then taped them down to a sheet of 3/4"
plywood.
Then I marked the outline with a
carpenter's pencil. i ran out of time for the evening (as the next step was to
use a sabre saw to cut out the pieces) because it was time for bed for my little
ones.