Ceiling Work Continues
I continued to work on the drop ceiling over
Lindenwood Yard
I finished the installation of the drop ceiling
over Lindenwood Yard yesterday. I had to buy some additional channel because I
decided not to rest the tiles on top of the florescent light tube fixtures. The
hard part was cutting the tiles to fit in the rounded corners at both ends of
the layout. It took a lot of trial and error (and getting up and down off the
benchwork), but I managed to get a decent fit. Actually putting the tiles in
place was a bit harder than I figured. There's not much room between the hard
backside of the valance and the wall. I think it also improved the lighting over
the layout as not much escapes into the floor joists above. I did manage to
scrape the sky backdrop in a few places. It will get touched up at some point
obviously, but I figured I'd wait until I get to the real scenery stage, and
large scale construction is basically done.
Posted: Sun - January 30, 2005 at 08:33 PM