Progress Updates
It's been awhile since I've made any updates to
the blog, so here's where I am.
A week ago, I had a whole weekend and week at
home alone. I was able to work on my layout every night and made a lot of
progress.First, I managed to complete
transferring the Lindenwood Yard CAD drawing from 3rdPlanIt to the
homasote.
I used a Sharpie marker and my T
square to line up push pin holes.I
have also laid cork from Lindenwood all the way to grade down to the Hidden
Return Loop.
It was the push pin highway for a
while.Finally Track is
Laid!!
I've successfully hand laid two #6
turnouts, which work great and rolling stock rolls through them well. I did
think to check for polarity issues and resolved some before setting them in
place.As of today, the track is laid
all the way up the grade. I've even tested a loco on it. My next steps are to
continue to lay track to Lindenwood, wire in the Loy's Toy's Automatic Reverse
Section Controller. I also need to finalize the use of Radio Shack ceramic
magnets for uncoupling purposes. I'll use a router and cut a depression in the
yard homasote.
Posted: Wed - May 11, 2005 at 10:13 PM