Late Post, More Plywood
Continuing installation of the plywood
subroadbed.
Back on March 30th I installed the return loop
portion of the plywood subroadbed. I also installed more risers to support the
grade. The gray strip you see on the grade is a piece of homosote cut to 2"
wide. That piece is a straight cut with no kerfs in it to make it
curvable.
Posted: Tue - April 5, 2005 at 09:22 PM