Late Post, More Plywood 


Continuing installation of the plywood subroadbed. 

Back on March 30th I installed the return loop portion of the plywood subroadbed. I also installed more risers to support the grade. The gray strip you see on the grade is a piece of homosote cut to 2" wide. That piece is a straight cut with no kerfs in it to make it curvable.

 

Posted: Tue - April 5, 2005 at 09:22 PM          


©