Prep for Thursday Night
I've prepared the room for my Thursday Night
train group.
I've cleaned up the layout room in preparation
for my Thursday Night train group, otherwise known as Big River Valley
Railroaders. I like to get things cleaned up, organized, and ready for the group
when they arrive. I figure having some semblance of cleanliness also helps with
safety. I do have two small children who like to help Daddy out in the train
room, so I tend to keep things picked up in there. I also picked up some
Homasote at a local concrete supply contractor in 4' x 5' sheets. I need to stop
by Home Depot and get one of those large jugs of Wood glue to glue the homasote
down and a knife blade for my jig saw for cutting the
stuff.So here's the work tasks for
Thursday:1) Install homasote in
Lindenwood Yard.2) Install open grid
framework that will support Rush Island Power
Plant.3) Install section of framework that
will be the beginning of the penisula.4)
Fabricate and install framework that will support the upper level hidden staging
yard.5) Tie framework from power plant and
along back wall to short penisula section.6)
Start cutting out subroadbed for section between Lindenwood Yard and
Byers7) Start cutting out subroadbed for
upper level hidden return loop and staging
yard.That should keep them busy. Yet
another interesting aspect of building a layout is that I get to play supervisor
for the work crews. Which means getting all the supplies together, getting the
cookies baked, the soda out, and the ice cold. When they arrive, I get to make
the assignments and hopefully keep everyone happily
employedHere's a look at the room and
the section that should be completed Thursday night. I'll post the results of
our work session later this week.
Posted: Tue - February 8, 2005 at 08:44 PM