Turnout Construction
After getting the layout running, I've started
back handlaying turnouts.
Well, after getting the layout running (and
having fun running something with my girls,) I've started back on handlaying
turnouts. So far I've made three #8 turnouts. The first is for SE Junction and
the other two are for the mainline crossover. Here's a picture of the completed
turnouts laying in approximately the right
positions.
Now my goal is to construct a set of 8
#6 turnouts. This will allow me to lay the mainline through Lindenwood Yard up
to the entrance to the helix. Right now it is taking me about 1 hour 15 minutes
to construct the "parts" for a single turnout and another 1 hour to solder it
together. I usually can do one of those tasks in the evening after the kids go
to bed. So for this next group of turnouts I decided to take a more "assembly
line" approach. I'll make all the parts for all the turnouts. Then solder them
up one by one. That way I'll keep my turnout construction skills sharp (though I
think they need improvement anyways). So here's a photo of what I accomplished
tonight. I've cut all the PC board ties to length for the
group.
So far I've invested about 45 minutes.
Seems like a lot of time to make ties, but I had to "set up" my station and bag
and tag all the different lengths so I know which is which when I need
them.
Posted: Mon - June 6, 2005 at 10:32 PM