Prep for this Thursday Night
I worked on making curvable sections of homasote
in preparation for Thursday Night Train Group.
Tonight I installed two more risers in the loop
portion of the plywood. Then I worked on making curvable sections of homasote by
cutting kerfs into the edge of a sheet of homasote, then cutting the length to
make the section 2" wide which matches the plywood. I also cut out a large
section that basically just matched the plywood in one section that was a bit
more complicated. (it's the piece under the stack of homasote
sections).So, this Thursday is Train
Night at my house again. I'll have the crew install all that homosote so that
everything from Lindenwood yard to the Hidden Return Loop has homasote as a
base. There's also a 3 track wide section that extends from the hidden return
loop to make a small staging yard. I'll have the crew cut out that piece of
plywood and install it as well. A small transition at SE Junction needs to be
routed into Lindenwood yard. This will form a transition from cork base (on
homasote) to Lindenwood Yard which will be track directly on
homasote.
Posted: Tue - April 5, 2005 at 09:31 PM