Ceiling Work Finished ... for now 


I've finished the work in the ceiling over Lindenwood Yard and the Rush Island Power Plant. 

I've finished installing the ceiling over the Rush Island Power Plant since the last entry. At least as far down as it needs to go for now. The purpose was to not have to get overhead and do all that work with the benchwork in place below it. I had to contend with an overhead heating duct that basically had to be framed in. With this work behind me, I can now move on to installing the benchwork for the power plant.


This is what it looks like over the power plant. You can see the heating duct in the far right of the picture.


This is what the ceiling tile installed over Lindenwood Yard looks like. It did help with lighting as not much escapes into the joists above. 

Posted: Wed - February 2, 2005 at 08:53 PM          


©