Ceiling Work Finished ... for now
I've finished the work in the ceiling over
Lindenwood Yard and the Rush Island Power Plant.
I've finished installing the ceiling over the
Rush Island Power Plant since the last entry. At least as far down as it needs
to go for now. The purpose was to not have to get overhead and do all that work
with the benchwork in place below it. I had to contend with an overhead heating
duct that basically had to be framed in. With this work behind me, I can now
move on to installing the benchwork for the power
plant.
This is what it looks like over the power
plant. You can see the heating duct in the far right of the
picture.
This is what the ceiling tile installed over
Lindenwood Yard looks like. It did help with lighting as not much escapes into
the joists above.
Posted: Wed - February 2, 2005 at 08:53 PM