Back to Benchwork
I assembled the open grid benchwork for the power
plant side of the layout.
The open grid framework for the power plant side
of the layout has been assembled. We will install the piece this coming Thursday
during my round-robin's group meeting night at my house. It will be screwed into
the studs in the walls, and two 2x2 leg supports will also be
installed.
Posted: Sun - February 6, 2005 at 06:41 PM