| | Don's door in place. Welcome Hobbits. |
| | | Mat applies Linseed Oil to rafters. |
| | | Rafters in place. Sculpting in progress. |
|
| | Shawna works oyster shells into the wall. |
| | | Metal sheeting put down first, then plywood. |
| | | A layer of roofing membrane goes on top of the wood. |
|
| | Professional roofer, Terry Kellogg, applies second membrane layer. |
| | | And next a "flashing membrane". |
| | | The fascia frames the edge of the roof. |
|
| | Terry applies "Rockwall", the final roofing layer. |
| | | The roof seen from above. |
| | | Josh and John hang chains for downspouts. |
|
| | Pumice for soil drainage goes into buckets. |
| | | One by one the buckets are hoisted up onto the roof. |
| | | John levels the pumice with a rake. |
|
| | He next spreads landscape fabric over it. |
| | | Lightweight "Verdir Systems" soil goes up next. |
| | | The chosen plants arrive by truck. |
|
| | Don hands John the plants. |
| | |