| | 01 DRAWING Avery Point dory drawing | |
| | | 02 SCARF cutting 1 to 12 scarf with jig | |
|
| | 03 SCARF anchoring epoxy joined scarf | |
| | | 04 RIB rib in preparation | |
|
| | 05 RIB application of epoxy to rib | |
| | | 06 RIB adding screws to epoxied rib | |
|
| | 07 RIB Screwing together rib sections | |
| | | 08 RIB cutting arch in rib | |
|
| | 09 RIB bandsaw triming rib edge | |
| |
| | | 12 TRANSOM transom fitting reinforcements | |
|
| | 13 TRANSOM transom side bottom view | |
| | | 14 TRANSOM transom routing inner edge | |
|
| | 15 TRANSOM tombstone transom full view | |
| | | 16 CHINE sawing edge of chine | |
|
| | 17 CHINE evening off the chine | |
| | | 18 CHINE Applying glass cloth & epoxy | |
|
| | 19 CHINE epoxying fiberglass cloth to chine | |
| | | 20 SEAT measuring for the seat | |
|
| | 23 OVERVIEW Stern interior | |
| | | 24 OVERVIEW chine untrimmed | |
|
| | 25 GUNWALE bending on the gunwale | |
| | | 26 OAR LOCKS Installing oar locks | |
|