Framing
Framing Inspection Passed
Mar/20/08 08:16 AM
Well, I met with our good buddy Vel from the city who inspected the house today, and overall I think it went GREAT! I half expected to have to redo everything I had done myself, but really it was just a few little things. Here are the things we have to change. This however is only the framing inspection.
1. Seal holes with draft stop or tuff stuff in the top plates and between floors. The shed dormer in the dining room can be sealed with spray foam insulation.
2. Sheath the back sides of the walls on second floor with some sort of rigid material: Foam sheets, or fiberboard.
3. Create access 22"x30" for both attic and above the master closet.
4. Install batt insulation
5. Blocking above closet under stairs.
And on top of that good news... Spring is here, more daylight and better weather for working on the house!
|