| | |
| | 1/31/03 Sanctuary entrance |
| | | | 1/31/03 The back wall of the rest rooms |
|
| | | It needs to be straightened |
| | | this is the East side of the church 02/0 |
|
| | Offices are being framed 02/03 |
| | |
| | |
| | |
| | |
| | |
| | | | Plywood is moved to the roof 02/10/03 |
|
| | A view through the front door 02/10 |
| | | | Workman fasten plywood 2/10/03 |
|
| | |
| | |
| | |
| | |
| | |
| | |