| | Horizontal bulkhead with foam installed. |
|
|
| | Horizontal bulkhead before main gear uptravel cutouts. |
|
|
| | Main gear bushing hole. More on that later. |
|
|
| | Checking main gear uptravel. Not quite enough yet, still more cutting to do. |
|
|
| | The transverse bulkhead before trimming |
|
|
| | Checking the gear uptravel to make shure it clears the lower spar cap. |
|
|
| | Installed the main gear bushings too soon. Had to improvise a method. |
|
|
| | During the transverse bulhead layup, used jig to force glass over the bushings. |
|
|
| | Method of compliance with KPC144, attaching center spar to horizontal bulkhead. |
|
|
| | Used Aeropoxy adhesive and syrenge to inject adhesive between spar and bulkhead. |
|
|
| | Cut BID for the interior of the horizontal bulkhead. |
|
|
| | Check the BID with the template before wet out to make sure it fits. |
|
|
| | Pre-wet the lay-ups on plastic wrap before installing makes it much easier. |
|
|
 |
 |