Section 6
 
This is the how the landing gear was assembled. Notice the lack fo hose in this assembly versus the factory plans.
 

Nose wheel retract cylinder installed .


Nose and main gear retract cylinder and associated plumbing installed.


Bulkhead connections to the pump on the other side


Clearence allowed for keel fittings


Main gear retract cylinder hydraulic connections


Nose gear doors installed with acuator and electro-hydraulic pump


Nose wheel doors open


Nose wheel well door control valve location


Nose wheel gear actuator up position


Nose gear actuator and dump valve.


Connie ready to get started on the keel.


Keel ready for installation of the controls before installation in the airplane.


Connie glassing the access cover.